Dan Syrcher's West Shore Dismantlement Photos
Also see more of Dan's Railfan Photos at Here and
and Remnants of the Niagara Falls Gorge Railway
Buffalo Central Terminal Aerial Photos
You are visitor
to Dan Syrcher's West Shore Dismantlement Photos
Photos 1 through 25 of 43 total   [Next (26 to 43)] [All]
Sort By: Alphabetical - Reverse Chronological - Chronological - Reverse Filesize - Filesize
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 17:31:45 2006 Subject: After completing the journey down the WS, I took a quick run up the Harlem Rd bridge and snapped this picture of CSX during humping ops. To the far left and above center is Central Terminal. image/jpeg, 1280x960 (24bit) 43-Frontier_Yard-hump.jpg    265005 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 17:22:19 2006 Subject: Here is the entrance to the WSRR yard at Harlem Rd. To the left of center you can see where rails have recently been removed. To the far left and out of view was a set of tracks also recently removed that also looked like they went underneath Harlem Rd. Also, while overlooking the yard it looks as though all the tracks merged at Harlem rd into a single or maybe double track. In the distance are tank cars that probably stretched to Bailey Ave. Once in a rare while, I have seen a Conrail caboose parked in here that's used for shoving ops only. image/jpeg, 960x1280 (24bit) 42-WS@Frontier.jpg    171766 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 17:08:45 2006 Subject: "The end of the line." We are at the intersection of Walden Ave and Harlem Rd. This intersection has been built up and over the WSRR. The yard is just past the intersection and about 50 feet below. image/jpeg, 1280x960 (24bit) 41-Harlem_rd.jpg    238553 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 17:03:03 2006 Subject: This is the last section of the WS just after Galleria drive bends left. This also ends at Harlem Rd and Walden Ave. Lots of overgrowth at this point but does open up further in. image/jpeg, 960x1280 (24bit) 40-last_stretch.jpg    347603 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 16:51:55 2006 Subject: WSRR meets Galleria Dr looking Southwest. image/jpeg, 960x1280 (24bit) 39.Galariadr.jpg    204604 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 16:44:43 2006 Subject: This is the Union Rd crossing looking Southwest. The Galleria Mall is just beyond the trees. You can see the I-90 bridge in the distant background. The building on the right received RR service at some point. If you zoom in on it you can still see where the 3 loading docks were. They have recently upgraded the building. image/jpeg, 1280x960 (24bit) 38-Unionrd.jpg    196039 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 16:39:00 2006 Subject: This is the Tops parking lot on Union Rd in Cheektowga,NY. Cayuga rd is behind be about 1 mile. image/jpeg, 1280x960 (24bit) 37-Tops@Union_rd.jpg    298515 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 16:34:32 2006 Subject: Standing at the Cayuga Rd crossing in Depew looking Southwest. This section of the WS was not part of the current R.J. Corman operation. image/jpeg, 960x1280 (24bit) 36-Cayuga_crossing.jpg    146056 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 16:29:06 2006 Subject: Would you believe that this is the same location? See what happens in nearly 4 months? Overgrowth. If you look to the right you can see my bike. It is sitting on the beginning of where the siding went to service P.J. Schmidt. Only a small amount of ballast remain. The rails on the left out of view under the growth have been pulled loose but not yet removed. image/jpeg, 1280x960 (24bit) 35-siding.jpg    269150 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 16:24:26 2006 Subject: This photo was taken in early May. Not much overgrowth at all. The building on the right was formerly the Peter J. Schmidt Company that served Bells Grocery Stores. They also received RR service from the WS. image/jpeg, 1280x960 (24bit) 34-siding.jpg    395538 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 16:15:35 2006 Subject: Another view of the wooden trestle. Looking Southwest. image/jpeg, 1280x960 (24bit) 33.trestle.jpg    354070 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 16:11:16 2006 Subject: Upper deck of the same wooden trestle. There use to be a smaller wooden trestle further Northeast, maybe 1000 feet, but I believe it has been removed. This is where the Genesee St crossing at Holtz Rd use to be before the new road work was begun. image/jpeg, 960x1280 (24bit) 32.trestle_deck.jpg    377512 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 16:05:41 2006 Subject: This is about 500 feet SW of the previous photo still looking Northeast. The rails on the right were not directly connected to the set of rails for the wye. When you zoom in, you can see that this set of tracks merged with the main on the left and then split for the wye further down. Also, on the far left is an old wooden trestle from probably WWII when the Curtiss Wright plant and Westinghouse plant was served by the RR's. This is the entrance to the west side of the plant. Not the east side near Holtz Rd. image/jpeg, 1280x960 (24bit) 31.wood_trestile.jpg    246258 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 15:59:31 2006 Subject: These are the rails that continue from/to the left set of rails in the above photo. This is where the western wye connects to the WS main. Most of the visible portion of the wye track will be ripped up and probably a little more. CSX only uses a portion of this wye. The main tracks on the left will be ripped up as well. The view is to the Northeast. image/jpeg, 960x1280 (24bit) 30-Wye.jpg    329832 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 15:50:09 2006 Subject: This is the beginning of the wye on the industrial track looking north. Take the left track and you head towards the Frontier Yard. Take the right track and you could have gone to New York. 417 miles away. image/jpeg, 1280x960 (24bit) 29-CSXwye.jpg    298637 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sun Aug 20 15:41:47 2006 Subject: This is the end of the eastern wye from the industrial track along Sonwil Dr. image/jpeg, 1280x960 (24bit) 28-CSXwye.jpg    281406 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sat Aug 19 15:45:28 2006 Subject: This photo is on the mainline looking SW. It's just before the access road to the Calspan test track which is about mid point of the photo. As of this photo, the rails still exist on the other side of the access road. image/jpeg, 1280x960 (24bit) 27-MainlineW.jpg    279501 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sat Aug 19 15:41:07 2006 Subject: Standing on the mainline looking opposite [NE] along the new culdesac. image/jpeg, 1280x960 (24bit) 26-MainlineE.jpg    189432 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sat Aug 19 15:33:05 2006 Subject: Basically the same position as above but standing on the mainline looking SW. No rails underneath the pavement. The new road that will be fed by the new intersection is visible in this photo. image/jpeg, 960x1280 (24bit) 25-mainline@Sonwill.jpg    187887 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sat Aug 19 15:28:29 2006 Subject: This is the current view of what's happening at Sonwil. NYSDOT is putting in a new intersection and therefore significantly modifying the crossing. I'm standing on the Wye and in the forground the rails are still in place and go under Sonwil. They've been ripped up on the other side for a while. Beyond the piles of stone in the background is the remains and active track for CSX's Sonwil warehouse deliveries. image/jpeg, 960x1280 (24bit) 24-wye_at_Sonwil.jpg    258579 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sat Aug 19 15:08:11 2006 Subject: Just short of Sonwil Dr. Wye on the left to Gardenville Yard and mainline on the right to the Frontier Yard. image/jpeg, 1280x960 (24bit) 23.wye.jpg    318331 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sat Aug 19 15:03:01 2006 Subject: MP417. The Depew/Rt78 exit from the NYS Thruway is also near mile marker 417 give or take a few feet. This marker was solidly in the ground before the ripping. They either tried to pull it out or hit it. It's still standing but damaged at it's base. image/jpeg, 1280x960 (24bit) 22-MP417.jpg    364104 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sat Aug 19 14:53:06 2006 Subject: This photo shows a better view of where the tracks seperated. The WS mainline on the right and the wye on the left. image/jpeg, 1280x960 (24bit) 21-ripped_wye.jpg    309270 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sat Aug 19 14:48:20 2006 Subject: In the foreground use to be a switch. This is where the east wye began to head to either NYC mainline or long ago the Gardenville line. This section of track was untouched for a long time until last year someone paved over the tracks at Sonwil Dr. I've never seen a CSX train come up any further than Sonwil Dr. image/jpeg, 1280x960 (24bit) 20-wye_switch.jpg    323274 bytes |
|
From: "Dan Syrcher" sst703 -AT- verizon -DOT- net Date: Sat Aug 19 14:40:29 2006 Subject: This is an up close view in the opposite direction of the bending rail. You can see in the background that one of the signals towers is still in place. As of this posting, it isn't standing anymore. It is lying along the ROW. This tower had a lot of damage also due to the 2000 snowstorm and various high winds. image/jpeg, 960x1280 (24bit) 19-ripped_rail.jpg    213922 bytes |