[Date Prev][Date Next]
[Chronological]
[Thread]
[Top]
Re: (erielack) EL Yard engine assignments and changes
My thanks to both Walter and to Steve for the in-depth information!
(Steve, I realize we had a similar discussion off-List concerning this topic
awile back.). Is there a person on the List with detailed knowledge of the
Marion Yard jobs?
In reference to the same yard engine being used for multiple shifts, how
many might a single RS-3 have been good for before needing to refuel?
As always, thanks to all!
Terry Miliczky
The Erie Lackawanna Mailing List
http://EL-List.railfan.net/
To Unsubscribe: http://Lists.Railfan.net/erielackunsub.html
------------------------------