[Date Prev][Date Next]
[Chronological]
[Thread]
[Top]
RE: (erielack) DL&W 4 track / 2 track
Mountain View Tower lasted up to around 1957. It controlled the
crossing and many of the electrically locked switches between the Totowa
area and Boonton. I think it controlled the crossovers at Lincoln
Park. Once on the center track it was a straight run through the
Denville flyover to Dover.
Ed Montgomery
- -----Original Message-----
From: Tupaczewski, Paul R (Paul) [mailto:paultup_@_alcatel-lucent.com]
Sent: Friday, April 20, 2007 10:43 AM
To: EL Mail List
Subject: RE: (erielack) DL&W 4 track / 2 track
Marty Harrison wrote:
> Not sure traffic drops
> were the reason. After the line conversion, IIRC, the only operators
> were at Denville Tower and Lynnhurst Draw.
What about at Mountain View? Was that remoted?
- Paul
The Erie Lackawanna Mailing List
Sponsored by the ELH&TS
http://www.elhts.org
To Unsubscribe: http://lists.elhts.org/erielackunsub.html
The Erie Lackawanna Mailing List
Sponsored by the ELH&TS
http://www.elhts.org
To Unsubscribe: http://lists.elhts.org/erielackunsub.html
------------------------------