[Date Prev][Date Next]
[Chronological]
[Thread]
[Top]
Re: (erielack) My Sample Timetables for Cutoff
- Subject: Re: (erielack) My Sample Timetables for Cutoff
- From: "RRSon239078481_@_aol.com"
- Date: Wed, 28 Jun 2000 15:03:10 EDT
In a message dated 6/28/00 2:22:48 PM Eastern Daylight Time,
"gkazin_@_netscape.net" writes:
<< Checking the EL timetable from 10/25/1964, the distance between Scranton
and
East Stroudsburg (DWG was closed by then) is 51.5 miles. Due to curvature of
the line (I think there are 3 complete circles of turns) they scheduled 70 to
88 minutes for the run with 2 stops (Pocono Summit and Cresco). I think
there
is an HOUR that got omitted from his projections here, for 12 minutes would
require 257.5 mph; 20 minutes would still require 154.5 mph. He's proposing
HHP engines, but there is no catenary in the plans (anyone have another $400
million to spare?) >>
Also an ocasional Rohr Turboliner would run the line.
------------------------------------------------------------
Visit the erielack photopage at http://el-list.railfan.net
------------------------------