Re: (erielack) KW TOWER QUESTION
- Subject: Re: (erielack) KW TOWER QUESTION
- From: ShepRail_@_aol.com
- Date: Sun, 19 Apr 2009 23:27:23 EDT
Bob & List,
KW was not among the drawings of Erie NY Division
Interlocking Towers maintained by the Office of Signal
Engineer. The last revision of these drawings was in
1947.
Drawing 154-S dated 8-25-46 shows the layout
of "BR" Interlocking at Croxton. Two tracks emerge
from the Bergen Tunnel and lead directly into Croxton
Yard with the notation "to J-N" whatever that means.
Bill Sheppard
**************