[Date Prev][Date Next] [Chronological] [Thread] [Top]

Re: (erielack) KW   TOWER QUESTION



Bob & List,

    KW was not among the drawings of Erie NY Division
Interlocking Towers maintained by the Office of Signal
Engineer. The last revision of these drawings was in
1947.

    Drawing 154-S dated 8-25-46 shows the layout
of "BR" Interlocking at Croxton. Two tracks emerge
from the Bergen Tunnel and lead directly into Croxton 
Yard with the notation "to J-N" whatever that means.

                                                         Bill Sheppard



**************
Access 350+ FREE radio stations anytime from anywhere on the web. 
Get the Radio Toolbar! 
(http://toolbar.aol.com/aolradio/download.html?ncid=emlcntusdown00000003)


	The Erie Lackawanna Mailing List
	http://EL-List.railfan.net/
	To Unsubscribe: http://Lists.Railfan.net/erielackunsub.html

------------------------------