Okay, you have a point and that could make sense,cost less, but I think  NS 
wouldn't allow it until the entire Lehigh Line was double tracked. Right  now 
they just have a few passing sidings west of Bound Brook, so its mostly  single 
track. The R&N/CP(along the exCNJ) would also have to rehab  the line through 
the Lehigh Gorge as well.
 
They could also take the Washington Secondary and get to Allentown/Jim  
Thorpe/Scranton that way, but that line would have to be completely rebuilt  by NS 
as well, which would cost millions..!
 
 
Steve