Paul Concerning your question about runthrough trains originating at Meadville: WCE was a horrible failure, operating only as a public relations gimmick to show support for Dereco and the connection to the New England States with a runthrough train. Many days on the Allegheny-Meadville Sub this train ran with one unit and four or five cars. I actually recall this train running the CTC between WC Jct and Steamburg and the track circuits dropping out because the train was operating at track speed and had only a few pieces of equipment. This track circuit issue frequently happened with a very short local or a set of engines running by themselves. I do recall the WCE starting out of Meadville on occasion, but only on occasion. If there was no WCE from the east, we had to start one at Meadville to protect the N&W connection at Huntington. When this was done, there was no hot traffic for via Huntington so it was usually a junk train out of Meadville with cars for Brier Hill or Akron or running lite to Brier Hill to get a cut of hoppers for Creston. The West Coast Expediter (a/k/a by the forces as the Water Closet Express) was not a successful train. I don't recall a CNW-97. SMT ************************************** See what's new at http://www.aol.com The Erie Lackawanna Mailing List Sponsored by the ELH&TS http://www.elhts.org To Unsubscribe: http://lists.elhts.org/erielackunsub.html ------------------------------
This HTML page is © 2000-2008 Blue Moon Online System and The Railfan Network
This page and the data contained therein may not be reproduced
for any form of commercial use without the explicit permission
of J. Henry Priebe Jr. or his duly authorized agent.