[Date Prev][Date Next]
[Chronological]
[Thread]
[Top]
Re: (erielack) CWR on the EL & curve elevation relaxation after #5 & #6
- Subject: Re: (erielack) CWR on the EL & curve elevation relaxation after #5 & #6
- From: Smtimko_@_aol.com
- Date: Thu, 12 Oct 2006 14:41:15 EDT
Paul
You are correct on the date of the welded rail between French Creek and
Shenango, 1967,
I rode the head end of a late #5 one day from Hornell to Youngstown and we
operated via the B&LE from French Creek to Shenango) Pete Hover was the EL
engineer and he fussed about having to wait for a pilot at FC as he was
previously qualified over the B&LE. He told the B&LE pilot "Go over and sit down
kid, I have forgotten more about this railroad than you'll ever know."
SMT
The Erie Lackawanna Mailing List
Sponsored by the ELH&TS
http://www.elhts.org
------------------------------