[Date Prev][Date Next] [Chronological] [Thread] [Top]

RE: (erielack) Boonton Line freight trains-analysis



Chuck,
 
1. The west end of the siding was controlled by Stroudsburg and the East end was controlled by Port Morris
2. The towers open at the time of the Conrail take over were: 
former DL&W - Stroudsburg, Port Morris, Dover, Denville, Summit, Roseville Ave., Newark, West End, Grove Street (Hoboken), Hoboken Terminal Tower. 
The drawbridge at Lyndhurst was an interlocking controlled by the bridge operator (not a towerman) as was the Lower Hackensack drawbridge at West End. 
 
former Erie - Suffern (SF), Waldwick (WC), Ridgewood (WJ) HX and DB drawbridges.
 
Rich
Charles_Walsh_@_Berlex.com wrote:

Rich,

Was the East Slateford siding controlled from the East Stroudsburg Tower or
Port Morris (UN?) Tower? Also, speaking of towers, what former DL&W towers
were still in operation in NJ at the time of the Conrail takeover?

Chuck




Richard Pennisi 
oo.com> To: "Tupaczewski, Paul R \(Paul\)" 

Sent by: erielack_@_lists.railfan.net 
erielack-owner_@_list cc: 
s.elhts.org Subject: 
RE: (erielack) Boonton Line freight trains-analysis 

10/04/2005 03:18 PM 
Please respond to 
Richard Pennisi 





Listers,

There was, at one time, a siding at Slateford. That was torn up way back
in the 60's some time. As a holdover from that siding there was a home
signal at East Slateford (where the siding ending) that was still there
until the end. Everytime there was a lightening storm around the Water
GAp, the relay house there at East Slateford was stuck and screwed up
everything for hours.

Rich

"Tupaczewski, Paul R (Paul)" 
wrote:
Chuck Walsh asked:


> Second point - wasn't there a passing siding just east of
> Slateford on the
> Cut-Off? If so, what role did that play on the single-track railroad
> between Bell's Bridge and Lincoln Park? (I might be confused
> about that.)

I thought the only passing siding on the cut-off was at Greendell. Perhaps
you're thinking about the "Old Road" coming off at Slateford, which forked
into two tracks just past the Junction?


- - Paul

P.S. Can we PLEASE trim the ends of the E-mails for Digest and dial-up
users? Please delete any older parts of the message that are no longer
relevant.

The Erie Lackawanna Mailing List
Sponsored by the ELH&TS
http://www.elhts.org


- ---------------------------------
Yahoo! for Good
Click here to donate to the Hurricane Katrina relief effort.

The Erie Lackawanna Mailing List
Sponsored by the ELH&TS
http://www.elhts.org






The Erie Lackawanna Mailing List
Sponsored by the ELH&TS
http://www.elhts.org

		
- ---------------------------------
Yahoo! for Good
 Click here to donate to the Hurricane Katrina relief effort. 

	The Erie Lackawanna Mailing List
	Sponsored by the ELH&TS
	http://www.elhts.org

------------------------------