[Date Prev][Date Next]
[Chronological]
[Thread]
[Top]
(erielack) Blairstown
The Stroudsburg Op had
to hoop orders; was that just for westbounds?
EXACTLY WHAT DO YOU MEAN BY THAT? HE NORMALLY WOULD HOOP ORDERS TO ANY
TRAIN IN EITHER DIRECTION THAT HAD TO GET THEM. THERE WAS NOTHING SPECIAL
ABOUT
WEST BOUNDS NEEDING SPECIAL TRAIN ODERS.
The reason I ask is that E Stroudsburg is only a few miles from Slateford
Jct and the Cutoff, and handing up orders is redundant with TCS.
THERE WAS WHAT WAS REFERED TO AS THE NEW CONNECTION WHICH CONNECTED THE OLD
LACKAWANNA MAIN BETWEEN UPPER HACK AND CROXTON, BUT I'M NOT EXACTLY SURE
WHAT
YEAR IT WAS CONNECTED. I WOULD GUESS SHORTLY AFTER THE MERGER. IT SIMPLY
DIVERGED FROM THE OLD LACKAWANNA MAIN JUST EAST OF NEW COUNTY ROAD, DROPPED
DOWN AND CONNECTED WITH THE THIRD TRACK WHICH RAN OUT TO DB DRAW, ON THE
GREENWOOD LAKE. FROM EITHER OF THOSE TWO TRACKS YOU COULD ENTER CROXTON
VIA THE
OLD LOOP OR THE NEW LOOP.
I've seen pictures of the "Old Loop"; where exactly was the "New Loop" in
relation to old?
Also where was the
connection between Croxton and Hoboken eventually installed?
ABOUT OPPOSIT GROVE ST TOWER, ON THE SOUTH SIDE OF THE LACKAWANNA. DOWN IN
THE AREA OF THE OLD LACKAWANNA PIGGY BACK RAMPS. CONNECTED TO THE ERIE 'S
LINE TO WEHAWKEN, JUST ON THE EAST SIDE OF THE ERIE'S TUNNEL.
So a Hoboken-Croxton transfer would have to perform a back-up move through
"Nave" on the Weehawken line before proceeding through the Bergen Arches?
Paul B
The Erie Lackawanna Mailing List
Sponsored by the ELH&TS
http://www.elhts.org
------------------------------