[Date Prev][Date Next]
[Chronological]
[Thread]
[Top]
Re: (erielack) B&SW Operations
- Subject: Re: (erielack) B&SW Operations
- From: Smtimko_@_aol.com
- Date: Fri, 19 Aug 2005 08:40:09 EDT
I'm certain that Mr. Heckman will respond with details since he worked the
line, but from what I remember, their were two sides to the Meadville--Buffalo
service. Once crew was home terminal Buffalo and the other home terminal
Meadville.
One crew left Meadville and operated to Buffalo via one route and after
taking rest, returned via the alternate route. The other crew left Buffalo on
one route, rested at Meadville and returned to Buffalo via the alternate route.
That resulted on one Buffalo-Meadville train in each direction on each
route--the B&SW as well as the Buffalo Divn., River Line, for instance:
RC-98 via B&SW, rest, return on BM-9 via River Jct. Home terminal Meadville.
BM-7 via B&SW, rest, return on MF-74 via River Jct. Home terminal Buffalo.
The trains that ran the B&SW changed from time to time as did the crews on
each train. I don't remember which crew had which runs at a specific time but
hopefully Jerry can assist.
SMT
The Erie Lackawanna Mailing List
Sponsored by the ELH&TS
http://www.elhts.org
------------------------------