[Date Prev][Date Next] [Chronological] [Thread] [Top]

Re: (erielack) Croxton Yard



 
In a message dated 5/4/2005 11:34:23 A.M. Eastern Daylight Time,  
thollritt_@_yahoo.com writes:

I passed  over the former Erie/EL (Now NS) Croxton yard, and noticed there's 
plenty of  activity at the former Roundhouse and Engine termial area. There's 
a pile of  old rusty steel (?) and a pile of old concrete (The former 
turntable pit and  roundhouse floor?). Lots of construction equipment too! Anyone know 
what's  going on?

Todd (ELHS 1318)



Todd
One of the new interchanges for the turnpike is going near there, including  
a pipe line right through that area.  They have had a bunch of young  
Archeologist type guys trying to document were everything is as they  excavate. Not 
sure who they are doing this for, the county or City or  ???   I spoke real 
briefly with one of them about a month  ago.
 
Croxton is a REAL mess also, because they are re paving, and putting  in new 
drainage ditches between Pads 2 and 3.  ( the two old EL piggy back  pads)  
Also they are putting in one additional pad track along side of  pad 2.  Don't 
know what its name will be yet.
 
Bob 


	The Erie Lackawanna Mailing List
	Sponsored by the ELH&TS
	http://www.elhts.org

------------------------------