[Date Prev][Date Next] [Chronological] [Thread] [Top]

(erielack) U23B dispo. findings



The recent commentary on the EL built-but-never-delivered U23Bs has
prompted some research on the matter.  When looking at the list of U23B
production, answers are not obvious, but suggestions abound....  


ATSF 6300-6323  24      6/70    AAR-B   264,000 37491-37514
  
ATSF 6324-6348      25  2/71    AAR-B   270,000 37515-37539

C&O 2300-2329   30      10/69   BLOM    277,000 37228-37257

PC 2700-2749    50      10/72   AAR-B   260,000 38506-38555

PC 2750-2776    27      10/73   AAR-B   260,000 39305-39331

LV 501-512      12      11/74   AAR-B   260,000 40098-40109

CR 2789-2798    10      6/77    AAR-B   260,000 41584-41593

D&H 2301-2316   16      9/69    AAR-B   260,000 36803-36818

FCP 537-546     10      9/75    AAR-B   257,000 40820-40829

L&N 2700-2707 (x-Monon)8        5/70    AAR-B   272,000 37293-37300

L&N 2708-2727   20      4/73    FB2     252,000 38765-38784

L&N 2728-2752   25      9/73    FB2     252,000 39257-39281

L&N 2753-2772   20      4/74    FB2     252,000 39508-39527

L&N 2800-2824   25      12/74   FB2     254,000 40110-40134

MILW 4800-4804  5       6/73    FB2     246,000 38772-38776

MKT 351-353     3       5/73    ARR-B   263,000 39225-39227

MP 2250-2256    7       2/73    FB2     264,000 38758-38764

MP 2257-2267    11      11/74   FB2     264,000 39905-39915

MP 2268-2273    6       3/75    FB2     265,000 40356-40361

MP 2274-2278    5       6/76    FB2     265,000 40920-40924

MP 2279-2288    10      1/77    FB2     266,000 41523-41532

Tex. Util 103   1       5/75    AAR-B   275,000 40719

WP 2251-2265    15      6/72    BLOM    260,000 38397-38411

SOU 3900-3904   5       5/72    ARR-B   266,000 38392-38396

SOU 3905-3914   10      6/73    ARR-B   266,000 39215-39224

SOU 3915-3934   20      5/74    ARR-B   266,000 39621-39640

SOU 3935-3954   20      7/75    FB2     260,000 40078-40097

SOU 3955-3969   15      2/77    FB2     262,000 41508-41522

NdeM 9100-9113  14      3/75    FB2     250,000 40326-40339

NdeM 9114-9121  8       5/75    AAR-B   257,000 40340-40347

NdeM 9122-9129  8       6/75    FB2     257,000 40348-40355

S. Peru 40-45   6       11/75   FB2     270,000 40372-40377

S. Peru 50-57   8       5/75    FB2     270,000 40362-40369

S. Peru 58,59   2       6/75    FB2     270,000 40370,40371


As noted, these EL units were financed similar to the LV units.  In looking
at production around the LV order, you can see that L&N 2800-2824 (25) 
were following LV 501-512, and SOU 3935-3954 (20) were ahead of them. 
Although the SOU units had lower serial numbers, they were actually
delivered (time-wise) AFTER the LV units.  This could either be attributed
to reconstruction of EL units to SOU features, or SOU offering to take a
production delay to get the USRA units out the door first.  The L&N 2800
series has 25 instead of 20 (could have been expanded), pre-maturely start
in a new number series, and they have different weights than the rest of
the L&N fleet though not the same weight as the LV units.    As only NdeM
(8), FCP (10), TUGCO (1) and CR (10) purchased the AAR-B truck after 1974,
the EL units were obviously re-trucked with Floating Bolster models before
delivery. 

- -- Kevin

 ------------------------------------------------------------
Visit the erielack photopage at http://el-list.railfan.net

------------------------------