Thumbnail Page for Directory cp8
|
|
CP8 Conrail Niagara Branch October 10, 1997 approx. 4pm EST - KE19 Eastbound passing the CP8 signal box with B23-7 1951 leading
File="1951-1.jpg" Size=27120 |
|
|
CP8 Conrail Niagara Branch October 10, 1997 approx. 4pm EST - KE19 Eastbound on the north leg of the wye to the Belt Line with B23-7 1951 leading
File="1951-2.jpg" Size=24071 |
|
|
Amtrak F40PH 260 with the westbound Maple Leaf passes H Tower between CP7 and CP8 on Conrail's Niagara Branch. It is about 30 minutes from the border at Niagara Falls
File="F40-260.jpg" Size=152580 |
|
|
CP8 Conrail Niagara Branch October 10, 1997 approx. 4pm EST - Amtrak Maple Leaf w/F40PH 217 leading
File="atk217.jpg" Size=23551 |
|
|
CR Dash 8-40CW 6052 approaches the bascule bridge at CP DRAW in South Buffalo
File="cr6052.jpg" Size=93338 |
|
|
CR Dash 8-40CW 6101 approaches a grade crossing in Conneaut, Ohio
File="cr6101.jpg" Size=99023 |
|
|
CR SD50 6735 approaches a grade crossing in Conneaut, Ohio
File="cr6735.jpg" Size=102884 |
|
|
CR GP10 7587 with an MT-4 slug trailing in Buffalo, NY
File="cr7587.jpg" Size=129744 |
|
|
East Broad Top RR narrow gauge mikado 17 heads on to the wye in Orbisonia to turn the train for the next run in the fall of 1991
File="ebt-17-1.jpg" Size=20635 |
|
|
On 9-2-97 at 3:45pm KE19 coming off the Wonalancet Runner for some work on KAMM siding near CP 8
File="ke19-1.jpg" Size=43770 |
|
|
On 9-2-97 at 3:45pm KE19 on the Niagara Branch leg of the WYE between CP8 and CP7 ready for a backup move for work on KAMM siding
File="ke19-2.jpg" Size=41382 |
|
|
On 9-2-97 at 3:45pm CR B23-7 2018 on KE19 has just completed some work on KAMM siding near CP 8 for Autokumpu which is the old Anaconda Brass plant in Buffalo, NY.
File="ke19.jpg" Size=45394 |